Kinross reports 2022 third-quarter results

Kinross reports 2022 third-quarter results

GlobeNewswire

Published

Company reports increased quarterly production and lower costs
Returned capital of approximately $300 million year-to-date

TORONTO, Nov. 09, 2022 (GLOBE NEWSWIRE) -- Kinross Gold Corporation (TSX: K, NYSE: KGC) (“Kinross” or the “Company”) today announced its results for the third-quarter ended September 30, 2022.

This news release contains forward-looking information about expected future events and financial and operating performance of the Company. Please refer to the risks and assumptions set out in our Cautionary Statement on Forward-Looking Information located on page 30 of this release. All dollar amounts are expressed in U.S. dollars, unless otherwise noted.

Results from the Company’s Russian and Ghanaian assets have been excluded from its Q3 2022 continuing results, along with comparative figures, due to the classification of these assets as discontinued as at September 30, 2022.

*Q3 2022 highlights from continuing operations: *

· *Gold equivalent production* of 529,155 Au eq. oz. produced, an increase of 17% compared with Q2.
· *Production cost of sales*^*1* of $941 per Au eq. oz. sold and *all-in sustaining cost*^2 of $1,282 per Au eq. oz. sold, representing reductions of 8% and 4%, respectively, compared with Q2.
· *Margins*^3 of $791 per Au eq. oz. sold.  
· *Operating cash flow*^4 of $173.2 million and *adjusted operating cash flow*^2 of $259.4 million.
· *Reported net earnings*^5 of $65.9 million, or $0.05 per share, with *adjusted net earnings*^2^, ^6 of $68.7 million, or $0.05 per share^2.
· *Cash and cash equivalents* of $488.4 million, and* total* *liquidity*^7 of approximately $2 billion at September 30, 2022.

*Return of capital: *

· Kinross returned approximately $300 million of capital to its shareholders year-to-date through its enhanced share buyback and quarterly dividend programs, or approximately $0.23 per share. *Full year return of capital is expected to be approximately $450 million.*
· Since launching an enhanced share buyback program in September, the Company has* re-purchased approximately $180 million* in shares, or 60%, out of the $300 million planned for 2022.
· Kinross’ Board of Directors declared a quarterly *dividend of $0.03 per common share *payable on December 15, 2022 to shareholders of record at the close of business on December 1, 2022.________________________
^1 “Production cost of sales from continuing operations per equivalent ounce sold” is defined as production cost of sales, as reported on the interim condensed consolidated statements of operations, divided by total gold equivalent ounces sold from continuing operations.
^2 These figures are non-GAAP financial measures and ratios, as applicable, and are defined and reconciled on pages 18 to 23 of this news release. Non-GAAP financial measures and ratios have no standardized meaning under IFRS and therefore, may not be comparable to similar measures presented by other issuers.  
^3 “Margins” from continuing operations per equivalent ounce sold is defined as average realized gold price per ounce from continuing operations less production cost of sales from continuing operations per equivalent ounce sold.
^4 Operating cash flow figures in this release represent “Net cash flow of continuing operations provided from operating activities,” as reported on the interim condensed consolidated statements of cash flows.
^5 Reported net earnings (loss) figures in this news release represent “Net earnings (loss) from continuing operations attributable to common shareholders,” as reported on the interim condensed consolidated statements of operations.   
^6 Adjusted net earnings figures in this news release represent “Adjusted net earnings from continuing operations attributable to common shareholders.”
^7 “Total liquidity” is defined as the sum of cash and cash equivalents, as reported on the interim condensed consolidated balance sheets, and available credit under the Company’s credit facilities (as calculated in Section 6 – Liquidity and Capital Resources of Kinross’ MD&A for the three and nine months ended September 30, 2022).

*
Company guidance: *

· Kinross is expecting its 2022 production to be approximately 2 million Au eq. oz., mainly due to the temporary delays in La Coipa’s mill ramp-up and commissioning related to the Tasiast 21k project. Full-year production from continuing operations for the year ended December 31, 2021 was 1,447,240 Au eq. oz.
· The Company expects its 2022 production cost of sales to be slightly above $900 per Au eq. oz. All-in sustaining cost is expected to be approximately $1,240 per Au eq. oz. sold^2. Consolidated production cost of sales was $832^8 per Au eq. oz. sold and attributable all-in sustaining cost of sales was $1,138^2^, ^8 per Au eq. oz. sold for the year ended December 31, 2021.
· The Company now anticipates its 2022 capital expenditures to be approximately $750 million mainly due to deferred capital development across the portfolio. Capital expenditures from continuing operations were $822 million for the year ended December 31, 2021.
· Kinross has updated its forecast to produce approximately 2.1 million attributable^9 Au eq. oz. in 2023 and 2024, respectively, and approximately 2 million attributable^9 Au eq. oz. in 2025.

*Development projects: *

· The *Great Bear *project in Red Lake, Ontario, continues to make excellent progress and the Company plans to declare an initial mineral resource estimate in early 2023. Drilling results continue to confirm Kinross’ vision of developing a large, long-life mining complex.
· The *Tasiast 24k* project is on schedule to reach 24,000 tonnes per day throughput in mid-2023.
· The *Manh Choh *project advanced well during the quarter with production expected in the second half of 2024.

*CEO Commentary:*
J. Paul Rollinson, President and CEO, made the following comments in relation to 2022 third-quarter results:

“During the quarter, our operations increased production and lowered costs, primarily driven by higher grades at Paracatu, enhanced seasonal recoveries from our U.S.-based heap leaches, and the ramp-up at La Coipa, which progressed well and is expected to continue trending upwards with the mill averaging throughput levels of approximately 9,500 tonnes per day in October. Tasiast is on track to significantly increase production in the fourth quarter, with higher recoveries and increased throughput, which is expected to contribute to our strongest quarter of 2022.

“We are excited about our pipeline of development and exploration projects, which all made strong progress during the quarter. At the world-class Great Bear project, drilling results continue to fulfill our expectations, including high-grade intercepts at depth, and we are on track to declare an initial mineral resource early next year.“We have returned approximately $300 million of capital to shareholders so far this year and expect to return a total of approximately $450 million by year-end through our share repurchase and dividend programs. Since launching our enhanced share buyback program in September, we have spent $180 million, effectively repurchasing for cancellation the shares that were issued as part of the Great Bear transaction while maintaining our quarterly dividend and investment-grade balance sheet.

“During the quarter we continued to advance our ESG goals. On climate change and emissions reductions, we have completed an analysis of climate-related scenarios and their potential impacts on our future business, advanced our pipeline of energy-efficiency projects, and entered into strategic partnerships with various technology providers, suppliers and electric utilities.”

________________________
^8 Results as previously reported for the year ended December 31, 2021 include Ghanaian and Russian operations. Production cost of sales per equivalent ounce sold for the year ended December 31, 2021 is “Consolidated production cost of sales per equivalent ounce sold” and is defined as production cost of sales, as reported on the consolidated statements of operations for the year ended December 31, 2021, divided by total gold equivalent ounces sold. Attributable all-in sustaining cost per equivalent ounce sold of $1,138 for the year ended December 31, 2021 includes Kinross' share of Chirano (90%) production and costs. The definition and reconciliation of this non-GAAP ratio is included on page 20 of this news release.
9* *Attributable production guidance includes Kinross' share of Manh Choh (70%) production.*Summary of financial and operating results*
*Three months ended* *Nine months ended* *September 30,* *September 30,*
(unaudited, in millions of U.S. dollars, except ounces, per share amounts, and per ounce amounts)   *2022*     2021     *2022*   2021  
*Operating Highlights *        
Total gold equivalent ounces^(a)        
Produced^(c)   *542,677*     486,819     *1,612,770*   1,591,939  
Sold^(c)   *509,431*     481,959     *1,517,337*   1,586,028          
Total gold equivalent ounces from continuing operations^(g)        
Produced^(c)   *529,155*     328,409     *1,361,554*   1,106,903  
Sold^(c)   *494,413*     325,162     *1,307,219*   1,104,293          
Attributable gold equivalent ounces^(a)        
Produced^(c)   *541,325*     483,060     *1,604,564*   1,579,928  
Sold^(c)   *507,930*     478,459     *1,508,555*   1,574,362          
*Financial Highlights from Continuing Operations*^*(g)*        
Metal sales *$* * 856.5*   $ 582.4   *$* * 2,378.9* $ 1,984.7  
Production cost of sales *$* * 465.3*   $ 289.8   *$* * 1,279.2* $ 914.0  
Depreciation, depletion and amortization *$* * 185.1*   $ 173.2   *$* * 532.1* $ 530.3  
Operating earnings (loss) *$* * 111.3*   $ (23.7 ) *$* * 277.8* $ 209.8  
Net earnings (loss) from continuing operations attributable to common shareholders *$* * 65.9*   $ (72.9 ) *$* * 137.9* $ 36.3  
Basic earnings (loss) per share from continuing operations attributable to common shareholders *$* * 0.05*   $ (0.06 ) *$* * 0.11* $ 0.03  
Diluted earnings (loss) per share from continuing operations attributable to common shareholders *$* * 0.05*   $ (0.06 ) *$* * 0.11* $ 0.03  
Adjusted net earnings from continuing operations attributable to common shareholders^(b) *$* * 68.7*   $ 11.2   *$* * 174.9* $ 183.4  
Adjusted net earnings from continuing operations per share^(b) *$* * 0.05*   $ 0.01   *$* * 0.14* $ 0.15  
Net cash flow of continuing operations provided from operating activities *$* * 173.2*   $ 140.3   *$* * 528.2* $ 547.1  
Adjusted operating cash flow from continuing operations^(b) *$* * 259.4*   $ 141.3   *$* * 760.4* $ 671.7  
Capital expenditures from continuing operations^(d) *$* * 197.3*   $ 203.8   *$* * 447.4* $ 566.0  
Free cash flow from continuing operations^(b) *$* * (24.1* *)* $ (63.5 ) *$* * 80.8* $ (18.9 )
Average realized gold price per ounce from continuing operations^(e) *$* * 1,732*   $ 1,792   *$* * 1,821* $ 1,797  
Production cost of sales from continuing operations per equivalent ounce^(c) sold^(f) *$* * 941*   $ 891   *$* * 979* $ 828  
Production cost of sales from continuing operations per ounce sold on a by-product basis^(b) *$* * 919*   $ 881   *$* * 966* $ 818  
All-in sustaining cost from continuing operations per ounce sold on a by-product basis^(b) *$* * 1,269*   $ 1,365   *$* * 1,279* $ 1,162  
All-in sustaining cost from continuing operations per equivalent ounce^(c) sold^(b) *$* * 1,282*   $ 1,369   *$* * 1,287* $ 1,169  
Attributable all-in cost^(h) from continuing operations per ounce sold on a by-product basis^(b) *$* * 1,555*   $ 1,766   *$* * 1,543* $ 1,552  
Attributable all-in cost^(h) from continuing operations per equivalent ounce^(c) sold^(b) *$* * 1,560*   $ 1,766   *$* * 1,547* $ 1,555  

^(a)   Total gold equivalent ounces produced and sold and attributable gold equivalent ounces produced and sold include results from the Kupol, Dvoinoye and Chirano mines up to their disposal. "Total gold equivalent ounces" includes 100% of Chirano production. "Attributable gold equivalent ounces" includes Kinross' share of Chirano (90%) production.
(b)   The definition and reconciliation of these non-GAAP financial measures and ratios is included in on pages 18 to 23 of this news release. Non-GAAP financial measures and ratios have no standardized meaning under IFRS and therefore, may not be comparable to similar measures presented by other issuers.
(c)   “Gold equivalent ounces” include silver ounces produced and sold converted to a gold equivalent based on a ratio of the average spot market prices for the commodities for each period. The ratio for the third quarter of 2022 was 89.91:1 (third quarter of 2021 – 73.45:1). The ratio for the first nine months of 2022 was 83.22:1 (first nine months of 2021 – 69.90:1).
(d)   “Capital expenditures from continuing operations” is as reported as “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows.
(e)   “Average realized gold price per ounce from continuing operations” is defined as gold metal sales from continuing operations divided by total gold ounces sold from continuing operations.
(f)   “Production cost of sales from continuing operations per equivalent ounce sold” is defined as production cost of sales divided by total gold equivalent ounces sold from continuing operations.
(g)   On June 15, 2022, the Company announced that it had completed the sale of its Russian operations, which includes the Kupol and Dvoinoye mines and the Udinsk project. On August 10, 2022, the Company announced that it had completed the sale of its Chirano mine in Ghana. Results for the three and nine months ended September 30, 2022 and 2021 are from continuing operations and exclude results from the Company’s Chirano and Russian operations due to the classification of these operations as discontinued as at September 30, 2022.
(h)   “Attributable all-in cost” includes Kinross’ share of Manh Choh (70%) costs.The following operating and financial results are based on third-quarter gold equivalent production and exclude Russian and Ghanaian operations except where noted:

*Production*: Kinross produced 529,155 Au eq. oz. in Q3 2022 from continuing operations, a 61% increase compared with 328,409 Au eq. oz. in Q3 2021. The year-over-year increase was primarily attributable to higher production at Tasiast due to the temporary suspension of milling operations as a result of the mill fire in June 2021, at Paracatu due to an increase in grade and recovery, and at La Coipa due to the restart and mill ramp-up.

*Average realized gold price*: The average realized gold price from continuing operations in Q3 2022 was $1,732 per ounce, compared with $1,792 per ounce in Q3 2021.

*Revenue*: During the third quarter, revenue from continuing operations increased to $856.5 million, compared with $582.4 million during Q3 2021.

*Production cost of sales*: Production cost of sales from continuing operations per Au eq. oz. sold increased to $941 for the quarter, compared with $891 in Q3 2021, mainly as a result of inflationary cost pressures on key consumables, such as fuel, emulsion and reagents across the portfolio.

Production cost of sales from continuing operations per Au oz. sold^2 on a by-product basis was $919 in Q3 2022, compared with $881 in Q3 2021, based on gold sales of 480,775 ounces and silver sales of 1,226,108 ounces.

*Margins*^3: Kinross’ margin from continuing operations per Au eq. oz. sold was $791 for Q3 2022, compared with the Q3 2021 margin of $901.

*All-in sustaining cost*^2: All-in sustaining cost from continuing operations per Au eq. oz. sold was $1,282 in Q3 2022, compared with $1,369 in Q3 2021.

In Q3 2022, all-in sustaining cost from continuing operations per Au oz. sold on a by-product basis was $1,269, compared with $1,365 in Q3 2021.

*Operating cash flow*: Operating cash flow from continuing operations^4 was $173.2 million for Q3 2022, compared with $140.3 million for Q3 2021.

Adjusted operating cash flow from continuing operations^2 increased to $259.4 million in Q3 2022, compared with $141.3 million for Q3 2021.

*Free cash flow*^2*: *Free cash flow from continuing operations in Q3 2022 was an outflow of $24.1 million, however included total working capital changes representing an outflow of $86.2 million^10. In Q3 2021, free cash flow was an outflow of $63.5 million.

*Earnings*: Reported net earnings^5 from continuing operations was $65.9 million, or $0.05 per share for Q3 2022, compared with reported net loss of $72.9 million, or $0.06 per share, for Q3 2021. The increase in reported net earnings was mainly due to the temporary suspension of milling operations at Tasiast in June 2021.

Adjusted net earnings from continuing operations^2^,^6 were $68.7 million, or $0.05 per share, for Q3 2022, compared with $11.2 million, or $0.01 per share, for Q3 2021.

*Capital expenditures*: Capital expenditures from continuing operations decreased to $197.3 million for Q3 2022, compared with $203.8 million for Q3 2021. The decrease was primarily due to mine sequencing at Tasiast, Fort Knox and Round Mountain involving a decrease in capital stripping, partially offset by increased expenditures at La Coipa and an increase in capital stripping at Bald Mountain.

*Balance sheet *

As of September 30, 2022, Kinross had cash and cash equivalents of $488.4 million, compared with $719.1 million at June 30, 2022.

During the quarter, the Company made net repayments of $100 million on the outstanding balance on its revolving credit facility and maintained its investment grade balance sheet.

As of September 30, 2022, the Company had additional available credit^11 of approximately $1.5 billion and total liquidity^7 of approximately $2 billion.

________________________
^10 Total working capital changes is defined as the sum of the changes in operating assets and liabilities, including income taxes paid, as reported on the interim condensed consolidated statements of cash flows (as shown in the adjusted operating cash flow from continuing operations reconciliation table on page 19 of this news release).
^11 “Available credit” is defined as available credit under the Company’s credit facilities and is calculated in Section 6 – Liquidity and Capital Resources of Kinross’ MD&A for the three and nine months ended September 30, 2022.*
Return of capital *

On September 19, 2022, Kinross announced an enhanced share buyback program, allocating an increased portion of asset sales’ proceeds and excess free cash flow to share buybacks. The Company believes Kinross’ shares offer exceptional returns on invested capital, and that the buyback offers a highly attractive use of excess cash. The buyback program will also allow reinvestment in the business and the maintenance of a strong credit profile.

Reflecting the Company’s financial strength and proceeds from recent asset sales, under the enhanced share buyback program Kinross has re-purchased approximately $180 million in shares, or 60% of the $300 million target for 2022. Year-to-date Kinross has returned approximately $300 million of capital through its enhanced share buyback and quarterly dividend programs, and expects to return total capital of approximately $450 million by year end.

On September 29, 2022, Kinross received approval from the Toronto Stock Exchange to increase its normal course issuer bid (“NCIB”) program. Under the amended NCIB program, the Company is authorized to purchase up to 114,047,070 of its common shares (out of the 1,300,045,558 common shares outstanding as at July 27, 2022) representing 10% of the Company’s public float, during the period starting on August 3, 2022 and ending on August 2, 2023.

As part of its continuing quarterly dividend program, the Company declared a dividend of $0.03 per common share payable on December 15, 2022 to shareholders of record at the close of business on December 1, 2022.

*Operating results*
Mine-by-mine summaries for 2022 third-quarter operating results may be found on pages 13 and 17 of this news release. Highlights include the following:

At *Tasiast*, production was largely in line with the previous two quarters, and higher year-over-year due to the temporary suspension of milling operations in June 2021. During the third quarter, planned mill availability, throughput and recovery were lower than expected due to some commissioning challenges. Three new leach tanks were brought online in September and October, which has enabled a new pre-oxidation stage and increased retention time, and is expected to drive higher recoveries. Higher recoveries and mill throughput are expected to result in an increase in fourth quarter production.

Cost of sales per ounce sold was lower quarter-over-quarter due to lower operating waste mined, and lower year-over-year due to the increase in production as a result of the temporary suspension of milling operations in 2021. Cost of sales per ounce sold is expected to decrease in the fourth quarter with the anticipated increase in production.

*Paracatu* performed well during the quarter, increasing production significantly compared with Q2 2022 and Q3 2021 mainly as a result of higher grade and higher recoveries, with continued high-grade material expected for the remainder of the year driving a further increase in production. Cost of sales per ounce sold was lower quarter-over-quarter mainly due to the increase in production and higher year-over-year mainly due to inflationary pressure on consumables, contractors, labour and maintenance costs.

At *Fort Knox, *production was largely in line with Q2 2022, and increased compared with Q3 2021 primarily due to higher mill throughput. The site had another strong quarter of stacking onto the leach pad, and solution grades from heap leach processing are increasing, positioning Q4 to be another strong quarter. Cost of sales per ounce sold was in line quarter-over-quarter and increased year-over-year primarily due to inflationary pressure on consumables and higher contractor costs.

At *Round Mountain*, production was higher than the previous quarter mainly due to more ounces recovered from the heap leach pads, and year-over-year production was largely in line. Cost of sales per ounce sold was lower quarter-over-quarter mainly due to higher production, and higher year-over-year related to inflationary cost pressures on consumables.

The Company has completed the Round Mountain optimization program, which evaluated four primary options to exploit the significant resources at the site: Phase S open pit pushback, Phase W3 open pit pushback, Phase X underground, and Gold Hill underground. 

Given the high levels of inflation experienced in Nevada, and the Company’s focus on capital discipline, cash flow generation, and resiliency, Kinross is prioritizing the underground opportunities at Phase X and Gold Hill, and continuing to mine Phase W (W1 and W2). The expansion opportunities at Phase W3 and Phase S have been deferred, and the associated ounces will remain in reserves and could potentially be exploited in the future as the environment improves. The two underground opportunities show potential for higher-margin, higher-return operations at Round Mountain compared to open pit, along with increased flexibility and optionality. A team with underground expertise has been assembled and the Company will be in position to start construction of an underground decline at Phase X next year.

*Bald Mountain* performed well during the quarter, with production increasing and cost of sales per ounce sold decreasing compared with Q2 2022. The quarter-over-quarter production increase was mainly due to more ounces recovered from the heap leach pads, partially offset by lower grades, while cost of sales per ounce was down mainly as a result of higher capitalized stripping. Year-over-year production was higher primarily due to more ounces recovered from the heap leach pads and, for the same time period, cost of sales per ounce sold was higher largely as a result of inflationary pressure on consumables.

At *La Coipa*, production increased significantly compared to the second quarter as the mill continued to ramp up and resolve commissioning challenges, and cost of sales per ounce sold were lower quarter-over-quarter mainly due to higher production. The pump and supply chain issues encountered earlier in the year have largely been resolved, with mill throughput steadily increasing month-over-month and October averaging approximately 9,500 tonnes per day (t/d) with multiple days at or above 13,000 t/d. The mill is now expected to steadily increase to a sustained design capacity of 13,000 t/d by the end of Q1 2023. 

*Development projects*

*Tasiast *

The *Tasiast 24k* project continues to progress on schedule to reach throughput of 24,000 t/d by mid-2023. Following project completion, it is expected that a ramp-up period will see 24,000 t/d plant throughput transitioning from an intermittent to consistent basis by the end of the year. Procurement is substantially complete, with all major equipment either on site or expected to arrive by year-end. Construction has commenced, and civil and concrete works are well advanced.

The 34MW *Tasiast solar power plant *continues to advance and is on schedule for completion in the second half of 2023. Engineering design is essentially complete and focused on deliverables for integration, procurement is well advanced with all long-lead critical procurement items ordered and site preparation started in October. The solar project is contributing to the Company’s efforts to reduce its greenhouse gas emissions and is expected to provide approximately 20% of the site’s power.

*Great Bear *

At the Great Bear project in Red Lake, Ontario, the Company continues to make excellent progress and is on schedule to declare an initial mineral resource in early 2023. The Company also plans to issue a Technical Report to support the resource.

To date, Kinross has drilled approximately 160,000 metres and is on track to complete at least 200,000 metres of exploration and infill drilling in 2022 at the Limb and LP Fault zones. Since its last update on July 27, 2022, the Company has received additional assay results, with a selection of the new results from targets at the LP Fault zone highlighted in the table below.

Drilling results continue to support the view of a high-grade, world-class deposit that underpins the prospect of a large, long-life mining complex. Results have also confirmed gold mineralization with good widths and high grades, including high-grade mineralization at depths of more than 500 metres. These results support the view that the LP Fault zone can support a long-life, high-grade, open-pit and underground mine. The initial results from the recently-completed 35,000 metre grade control drill program have also helped confirm the high grade, continuous nature of the intercepts observed in the LP Fault zone.

The Company is also analyzing an advanced exploration program that would establish an underground decline and allow for more efficient exploration of deeper areas of the LP Fault, along with the nearby Hinge and Limb gold zones, as well as bulk sampling. The Company is targeting a potential start of the advanced program as early as 2024.

Baseline environmental surveys, local community socio-economic studies and engineering activities required for the permitting process are progressing well.  Kinross continues to advance its comprehensive local outreach and engagement program for all Red Lake regional communities, including the establishment of a community office. The Company is taking steps to build technical capacity and active site participation in the area of environmental monitoring with Wabauskang and Lac Seul First Nation partners, on whose traditional territories the project is located.

*Selected Great Bear Drill Results*

See Appendix A for full results.

*Hole ID*   *From (m)* *To *
*(m)* *Width (m)* *True *
*Width (m)* *Au *
*(g/t)* *Target*              
BR-545   428.5 453.8 25.3 24.5 3.64 Yauro
BR-545 including 429.5 431.4 1.95 1.8 36.34  
BR-545 and 459.5 472.8 13.35 10.3 0.38  
BR-545 and 486.9 492.5 5.6 5.0 0.60  
BR-576   666.8 670.0 3.25 2.8 0.60 Yuma
BR-576 and 703.0 711.1 8.1 7.1 11.83  
BR-576 including 704.0 707.0 3 2.8 29.54  
BR-576 and 742.3 755.3 13 10.3 0.43  
BR-576 and 809.7 815.7 6 5.0 0.59  
BR-596   687.1 694.5 7.4 6.6 3.73 Yuma
BR-596 including 687.1 691.0 3.9 3.7 6.85  
BR-596 and 701.0 738.8 37.75 28.3 1.03  
BR-612   399.0 412.5 13.5 12.7 1.91 Auro
BR-612 including 402.0 405.0 3 2.8 4.27  
BR-612 and 436.0 441.0 5 4.1 19.97  
BR-612 including 436.0 439.5 3.5 3.1 27.77  
BR-612 and 461.0 466.6 5.6 4.1 1.39  
BR-621   174.0 178.6 4.6 4.2 0.67 Auro
BR-621 and 189.7 205.3 15.6 14.4 0.38  
BR-621 and 245.3 250.0 4.7 3.8 0.68  
BR-621 and 311.5 320.0 8.5 7.7 0.51  
BR-621 and 330.0 374.9 44.9 43.1 2.27  
BR-621 including 347.0 365.8 18.75 16.5 3.16  
BR-621 and including 372.0 373.0 1 1.0 26.50  
BR-621 and 468.0 471.9 3.9 3.6 0.62  
BR-621 and 480.5 495.0 14.5 11.2 0.48  
BR-623   545.0 551.0 6 4.4 2.03 Auro
BR-623 and 578.0 608.8 30.75 22.8 7.62  
BR-623 including 585.7 597.0 11.3 10.9 18.60  
BR-623 and 627.3 628.0 0.75 0.7 18.90  
BR-623 and 755.0 763.3 8.3 7.1 0.36  
BR-623 and 806.7 809.6 2.95 2.8 3.23  
BR-624   634.8 652.0 17.2 13.4 0.43 Auro
BR-624 and 670.0 698.5 28.5 23.1 7.11  
BR-624 including 677.1 684.0 6.95 5.1 26.83  
BR-624 and 823.0 832.0 9.05 7.5 0.58  
BR-700   682.8 761.3 78.5 65.9 0.67 Yuma
BR-700 and 802.0 817.0 15 11.9 1.88  
BR-700 including 812.1 813.7 1.6 1.2 15.10  
BR-700 and 924.4 932.0 7.6 5.9 0.44  
BR-700 and 940.7 945.5 4.75 4.1 0.45  

^Results are preliminary in nature and are subject to on-going QA/QC.

See Appendix B for a LP Fault zone long section.

See Appendix C for a visual representation of the conceptual geological interpretation of the potential Great Bear deposit.

View an interactive 3D model of the Great Bear project here:
https://vrify.com/decks/Great-Bear-Project-Ontario-Canada-September-15-2022 (Updated to September 15, 2022).
*Manh Choh *

On July 27, 2022, the Company, as the operator of the joint venture, announced that it will proceed with development of the 70%-owned Manh Choh project in Alaska. The project is expected to increase the Company’s production profile in Alaska by a total of approximately 640,000 attributable Au eq. oz. over the life of mine at lower costs. Initial production from Manh Choh is expected in the second half of 2024.

Early works at Manh Choh are focused on camp and initial road access, which are proceeding on schedule and on budget. At Fort Knox foundation work for the processing infrastructure upgrades are underway. Permitting is progressing well and the Company received its wetland permit in the third quarter. Procurement and contracting activities are advancing well, prioritizing local employment and contracting, including with the Native Village of Tetlin.

*Lobo-Marte *

Kinross continues to advance permitting activities at *Lobo-Marte* in order to preserve its optionality for Kinross’ long-term portfolio. The Company continues to study opportunities to extend La Coipa’s mine life up to the end of the decade, with the potential additions of a new Puren pushback, as well as the adjacent Coipa Norte and Can-Can pushbacks. Those extensions would enter into the regular permitting cycle in the upcoming years. As a result, the Company has decided to defer submission of the Lobo-Marte Environmental Impact Assessment (EIA), as the content of that application will depend, in part, on the extent of any mine life extensions at La Coipa and other factors such as gold price, local permitting process, and other economic considerations. The Company continues to believe in the project’s long-term development potential as a large, low-cost mine upon the conclusion of mining at La Coipa.

*Curlew Basin exploration *

At the *Curlew* exploration project in Washington State, located approximately 35 kilometres north of the Company’s Kettle River mill by paved road, drilling from underground has confirmed the understanding of mineralized vein orientations. The Company is on schedule to declare a mineral resource in early 2023 with the drilling information to date. Underground exploration drilling is still underway and will continue into 2023 after which an updated resource will be presented at a later date as the project is expected to grow beyond the year-end resource.

Exploration drill results received during the quarter include:· *Hole # 1116 – 2.4m @ 11.59 g/t Au – West Zone target *
· *Hole # 1118– 2.9m @ 7.12 g/t Au – Stealth target*
· *Hole # 1120– 5.2m @ 5.37 g/t Au – LP target**Round Mountain Gold Hill exploration *

At the *Gold Hill* exploration project, located approximately seven kilometres northeast of Round Mountain in Nevada, exploration drilling continued to return encouraging results. Drilling at the main zone (extension of the Gold Hill pit) has confirmed multiple >150m strike and dip extensions of the primary vein and parallel vein structures. Results received this quarter include:

· *D-1175 – 2.5m @ 8.04 g/t Au (incl. 0.8m @ 23.3 g/t Au) *
· *D-1173A – 2.3m @ 6.93 g/t Au (incl. 0.3m @ 36.90 g/t Au)*

Drilling along the parallel Alexandria vein (600m south of Main) has also returned encouraging results such as *D-1176 **– 1.9m @ 24.24g/t Au (Incl. 0.4m @ 107g/t Au)*, as well as visible gold in veins beneath the sinter (assays pending).

Gold Hill is a low sulfidation epithermal vein system consisting of high-grade narrow quartz veins with significant strike continuity. Historic underground mining (current pit area) produced approximately 40koz with a grade of 10g/t Au. Exploration this year focused on testing the strike and dip limits of Main and Alexandria, both of which remain open along strike. Exploration work will continue these efforts, as well as test for parallel veins outside of the two primary zones.

*Company guidance *
The following section of the news release represents forward-looking information and users are cautioned that actual results may vary. We refer to the risks and assumptions contained in the Cautionary Statement on Forward-Looking Information on page 30 of this news release. This Company Guidance section references all-in sustaining cost per equivalent ounce sold, which is a non-GAAP ratio with no standardized meaning under IFRS and therefore, may not be comparable to similar measures presented by other issuers. The definition of this non-GAAP ratio and comparable reconciliation is included on pages 18 to 23 of this news release.

The Company’s Russian and Ghanaian assets have been excluded from its guidance due to the classification of these assets as discontinued as at September 30, 2022.

As Kinross’ share of Chirano (90%) is excluded from guidance, all 2022 guidance figures are no longer on an attributable basis, but on a total basis.

*Production guidance *

The Company expects its 2022 production to be approximately 2 million Au eq. oz., mainly due to slower-than-expected ramp-up at La Coipa and challenges associated with commissioning the Tasiast 21k project. 

Kinross previously guided 2.3 million and 2.1 million Au eq. oz. (+/- 5%) in 2023 and 2024, respectively. The Company now expects to produce approximately 2.1 million attributable^9 Au eq. oz. in 2023 and 2024, respectively, and approximately 2 million attributable^9 Au eq. oz. in 2025. This deferral of production is based on thorough assessments that have been completed by our new operations leadership with a focus on more resilient, balanced and de-risked mine plans.

*Cost guidance*^*12*

The Company expects to be slightly above its revised 2022 production cost of sales guidance of approximately $900 per Au eq. oz. and in line with its revised all-in sustaining cost guidance of approximately $1,240 per Au eq. oz. sold^2. In 2021^8, production cost of sales was $832 per Au eq. oz. and all-in sustaining cost was $1,138 per Au eq. oz. sold^2.

________________________
^12 Based on a gold price of $1,800 per ounce and an oil price of $100 per barrel (including a $10 per barrel change in the price of oil would be expected to result in an approximate $4 impact on fuel consumption costs on production cost of sales per ounce), as disclosed in Kinross’ Q2 2022 results news release from July 27, 2022. The other key assumptions and sensitivities disclosed in the Company’s original guidance on February 16, 2022 have not changed.*
Capital expenditures guidance *

Kinross expects its 2022 capital expenditures to be approximately $750 million mainly due to less capitalized stripping across the portfolio  and delayed spending on the Tasiast solar power project. Capital expenditures from continuing operations was $822 million for the year ended December 31, 2021. Kinross’ previous 2022 guidance for capital expenditures was $850 million (+/- 5%).

*Organizational update*

On August 10, 2022, Kinross announced that it had completed the sale of all its interest in the Chirano mine in Ghana to Asante Gold Corporation for total consideration of $225 million in cash and shares. Kinross received $60 million in cash and approximately 35 million Asante common shares upon close, with the remainder in deferred payments.

Since completing the Chirano divestment, as well as completing the divestment of the Company’s assets in Russia on July 15, 2022, Kinross has adjusted its regional head office presence to be more in line with its Americas-focused portfolio. The optimized operating model is expected to keep our go-forward overhead costs at approximately the same per ounce level going forward as we had expected prior to the divestitures.

Further, during the quarter, the Company appointed Claude Schimper to the position of Executive Vice-President and Chief Operating Officer, where he will be responsible for the Company’s operational success. Ned Jalil, Senior Vice-President, Technical Services, has assumed leadership of Kinross’ project development, exploration, geology, metallurgy, mine planning, operations strategy and supply chain functions.

At Tasiast, the Company is engaged in discussions with employee delegates regarding the collective labour agreement, which is set to expire at year-end. 

*Environment, Social and Governance (ESG) update*

Following the publication of Kinross’ 2021 Sustainability and Climate reports in Q1 and Q2 respectively, the Company updated its contributions towards the Sustainable Development Goals developed by the United Nations as important societal goals, including a summary of results at the Chirano mine in Ghana, which was sold during the quarter.

In Mauritania, severe flooding in the Inchiri region in early September affected local cities and communities around the Tasiast mine, including the regional hospital. Kinross provided significant and timely humanitarian relief including food and supplies, as well as the delivery of a container of medical supplies and equipment through our partnership with health NGO, Project C.U.R.E., with a value of approximately $450,000.

Advancing our climate change strategy, Kinross completed an analysis of climate-related scenarios, following the governance recommendations of the Task Force on Climate-related Financial Disclosures. The Company also continued to advance its pipeline of energy efficiency projects, as well as strategic partnerships with various technology providers, Original Equipment Manufacturers and electric utilities. We have continued to improve our governance of climate change risks and opportunities by embedding the forecasting of emissions directly into the life of mine models of each of our assets and projects.

Kinross’ strong ESG performance was externally-recognized in major ESG rankings and ratings. The Company’s S&P Global ESG score increased three points in 2022, ranking in the 96th percentile, the Company’s highest score since 2014, which was driven primarily by improved scores in the Environment dimension. The Company’s Sustainalytics risk rating improved to medium from high and its MSCI score was maintained at “A.”

*Conference call details *

In connection with this news release, Kinross will hold a conference call and audio webcast on Thursday, November 10, 2022 at 8:00 a.m. EDT to discuss the results, followed by a question-and-answer session. To access the call, please dial:

*Canada & US toll-free* – +1 (888) 330-2446; Passcode: 4915537
*Outside of Canada & US* – +1 (240) 789-2732; Passcode: 4915537

Replay (available up to 14 days after the call):

*Canada & US toll-free* – +1 (800) 770-2030; Passcode: 4915537
*Outside of Canada & US* – +1 (647) 362-9199; Passcode: 4915537

You may also access the conference call on a listen-only basis via webcast at our website www.kinross.com. The audio webcast will be archived on www.kinross.com.

This release should be read in conjunction with Kinross’ 2022 third-quarter unaudited Financial Statements and Management’s Discussion and Analysis report at www.kinross.com. Kinross’ 2022 third-quarter unaudited Financial Statements and Management’s Discussion and Analysis have been filed with Canadian securities regulators (available at www.sedar.com) and furnished with the U.S. Securities and Exchange Commission (available at www.sec.gov). Kinross shareholders may obtain a copy of the financial statements free of charge upon request to the Company.

*About Kinross Gold Corporation *

Kinross is a Canadian-based global senior gold mining company with operations and projects in the United States, Brazil, Mauritania, Chile and Canada. Our focus is on delivering value based on the core principles of responsible mining, operational excellence, disciplined growth, and balance sheet strength. Kinross maintains listings on the Toronto Stock Exchange (symbol:K) and the New York Stock Exchange (symbol:KGC).

*Media Contact *

Samantha Sheffield
Senior Manager, Corporate Communications
phone: 416-365-3034
samantha.sheffield@kinross.com

*Investor Relations Contact*
Chris Lichtenheldt
Vice-President, Investor Relations
phone: 416-365-2761
chris.lichtenheldt@kinross.com*
*

*Review of operations*
                     
*Three months ended September 30, (unaudited) *   *Gold equivalent ounces*               *Produced*   *Sold*   *Production cost of
sales* ($millions)   *Production cost of
sales/equivalent ounce sold * *2022* 2021   *2022* 2021     *2022*   2021     *2022*   2021                      
Fort Knox *75,522* 71,336   *74,221* 71,482   *$* * 88.6* $ 67.7   *$* * 1,194* $ 947
Round Mountain *62,417* 63,242   *61,757* 61,405     *87.0*   60.8     *1,409*   990
Bald Mountain *65,394* 55,559   *52,472* 52,874     *51.2*   48.8     *976*   923
Paracatu *159,113* 134,425   *152,616* 133,924     *131.1*   103.7     *859*   774
La Coipa *33,955* -   *24,681* -     *12.1*   -     *490*   -
Maricunga *-* -   *652* 655     *0.5*   0.5     *767*   763
*Americas Total * *396,401* 324,562   *366,399* 320,340     *370.5*   281.5     *1,011*   879                      
Tasiast *132,754* 3,847   *128,014* 4,822     *94.8*   8.3     *741*   1,721
*West Africa Total* *132,754* 3,847   *128,014* 4,822     *94.8*   8.3     *741*   1,721                      
*Continuing Operations Total* *529,155* 328,409   *494,413* 325,162     *465.3*   289.8     *941*   891                      
*Discontinued Operations*                      
Kupol *-* 120,822   *-* 121,798     *-*   81.8   *$* * -* $ 672
Chirano (100%) *13,522* 37,588   *15,018* 34,999     *24.3*   49.4     *1,618*   1,411 *13,522* 158,410   *15,018* 156,797     *24.3*   131.2                                                                        
*Nine months ended September 30, (unaudited) *   *Gold equivalent ounces*               *Produced*   *Sold*   *Production cost of
sales* ($millions)   *Production cost of
sales/equivalent ounce sold * *2022* 2021   *2022* 2021     *2022*   2021     *2022*   2021                      
Fort Knox *207,509* 190,453   *204,732* 189,206   *$* * 248.6* $ 193.1   *$* * 1,214* $ 1,021
Round Mountain *164,445* 205,456   *160,171* 207,218     *214.1*   184.1     *1,337*   888
Bald Mountain *155,573* 143,854   *147,961* 142,507     *146.0*   127.4     *987*   894
Paracatu *396,545* 411,891   *387,974* 404,209     *367.3*   295.2     *947*   730
La Coipa *41,893* -   *31,780* -     *17.8*   -     *560*   -
Maricunga *-* -   *2,328* 1,966     *1.5*   1.4     *644*   712
*Americas Total * *965,965* 951,654   *934,946* 945,106     *995.3*   801.2     *1,065*   848                      
Tasiast *395,589* 155,249   *372,273* 159,187     *283.9*   112.8     *763*   709
*West Africa Total* *395,589* 155,249   *372,273* 159,187     *283.9*   112.8     *763*   709                      
*Continuing Operations Total* *1,361,554* 1,106,903   *1,307,219* 1,104,293     *1,279.2*   914.0     *979*   828                    
*Discontinued Operations*                      
Kupol *169,156* 364,929   *122,295* 365,075     *83.8*   231.0     *685*   633
Chirano (100%) *82,060* 120,107   *87,823* 116,660     *131.2*   155.9     *1,494*   1,336 *251,216* 485,036   *210,118* 481,735     *215.0*   386.9      

*
Interim condensed consolidated balance sheets*

(unaudited, expressed in millions of U.S. dollars, except share amounts)                               *As at**
*     *September 30,
2022*   * * *December 31,
2021*                  
Assets              
Current assets              
Cash and cash equivalents   $ 488.4     $ 531.5    
Restricted cash   8.2     11.4    
Accounts receivable and other assets   292.2     214.5    
Current income tax recoverable   6.5     10.2    
Inventories   1,092.1     1,151.3    
Unrealized fair value of derivative assets   26.7     30.0       1,914.1     1,948.9    
Non-current assets              
Property, plant and equipment   7,860.3     7,617.7    
Goodwill   -     158.8    
Long-term investments   99.0     98.2    
Other long-term assets   666.1     598.0    
Deferred tax assets   -     6.5    
Total assets   $ 10,539.5     $ 10,428.1                  
Liabilities              
Current liabilities              
Accounts payable and accrued liabilities   $ 495.6     $ 492.70    
Current income tax payable   52.6     95.00    
Current portion of long-term debt and credit facilities   40.0     40.00    
Current portion of provisions   35.8     90.00    
Other current liabilities   19.1     23.70       643.1     741.40    
Non-current liabilities              
Long-term debt and credit facilities   2,471.6     1,589.90    
Provisions   678.1     847.90    
Long-term lease liabilities   25.50     35.10    
Other long-term liabilities   131.20     127.40    
Deferred tax liabilities   356.80     436.80    
Total liabilities   $ 4,306.30     $ 3,778.50                  
Equity              
Common shareholders' equity              
Common share capital   $ 4,679.60     $ 4,427.70    
Contributed surplus   10,675.00     10,664.40    
Accumulated deficit   (9,108.50 )   (8,492.40 )  
Accumulated other comprehensive income (loss)   (69.20 )   (18.80 )  
Total common shareholders' equity   6,176.90     6,580.90    
Non-controlling interests   56.30     68.70    
Total equity   6,233.20     6,649.60    
Total liabilities and equity   $ 10,539.50     $ 10,428.10                  
Common shares              
Authorized   Unlimited     Unlimited    
Issued and outstanding   1,285,406,778     1,244,332,772                  

*
Interim condensed consolidated statements of operations*

(unaudited, expressed in millions of U.S. dollars, except share and per share amounts)                     *Three months ended*   *Nine months ended*     *September 30,*   September 30,   *September 30,*   September 30,       *2022*       2021       *2022*       2021    
*Revenue*                  
Metal sales   *$* * 856.5*     $ 582.4     *$* * 2,378.9*     $ 1,984.7                      
*Cost of sales*                  
Production cost of sales     *465.3*       289.8       *1,279.2*       914.0    
Depreciation, depletion and amortization     *185.1*       173.2       *532.1*       530.3    
*Total cost of sales*     *650.4*       463.0       *1,811.3*       1,444.3    
*Gross profit*     *206.1*       119.4       *567.6*       540.4    
Other operating expense     *12.2*       92.3       *83.7*       181.7    
Exploration and business development     *42.3*       24.4       *105.6*       63.4    
General and administrative     *40.3*       26.4       *100.5*       85.5    
*Operating earnings (loss)*     *111.3*       (23.7 )     *277.8*       209.8    
Other income (expense) - net     *5.6*       3.3       *(0.4* *)*     (8.7 )  
Finance income     *6.5*       1.2       *10.7*       4.1    
Finance expense     *(23.3* *)*     (18.5 )     *(68.0* *)*     (56.0 )  
*Earnings (loss) from continuing operations before tax*     *100.1*       (37.7 )     *220.1*       149.2    
Income tax expense - net     *(34.5* *)*     (35.4 )     *(82.7* *)*     (113.6 )  
Earnings (loss) from continuing operations after tax     *65.6*       (73.1 )     *137.4*       35.6    
Earnings (loss) from discontinued operations after tax     *(0.8* *)*     27.2       *(636.3* *)*     186.1    
*Net earnings (loss)*   *$* * 64.8*     $ (45.9 )   *$* * (498.9* *)*   $ 221.7    
*Net earnings (loss) from continuing operations attributable to:*                  
Non-controlling interests   *$* * (0.3* *)*   $ (0.2 )   *$* * (0.5* *)*   $ (0.7 )  
Common shareholders   *$* * 65.9*     $ (72.9 )   *$* * 137.9*     $ 36.3    
*Net earnings (loss) from discontinued operations attributable to:*                  
Non-controlling interests   *$* * 0.2*     $ (0.8 )   *$* * 0.8*     $ (1.5 )  
Common shareholders   *$* * (1.0* *)*   $ 28.0     *$* * (637.1* *)*   $ 187.6    
*Net earnings (loss) attributable to:*                  
Non-controlling interests   *$* * (0.1* *)*   $ (1.0 )   *$* * 0.3*     $ (2.2 )  
Common shareholders   *$* * 64.9*     $ (44.9 )   *$* * (499.2* *)*   $ 223.9    
*Earnings (loss) per share from continuing operations attributable to common shareholders*                  
Basic   *$* * 0.05*     $ (0.06 )   *$* * 0.11*     $ 0.03    
Diluted   *$* * 0.05*     $ (0.06 )   *$* * 0.11*     $ 0.03    
*Earnings (loss) per share from discontinued operations attributable to common shareholders*   *$* * -*     $ 0.02     *$* * (0.49* *)*   $ 0.15    
Basic   *$* * -*     $ 0.02     *$* * (0.49* *)*   $ 0.15    
Diluted                  
*Earnings (loss) per share attributable to common shareholders*                  
Basic   *$* * 0.05*     $ (0.04 )   *$* * (0.39* *)*   $ 0.18    
Diluted   *$* * 0.05*     $ (0.04 )   *$* * (0.39* *)*   $ 0.18    

*
Interim condensed consolidated statements of cash flows*

(unaudited, expressed in millions of U.S. dollars)                     *Three months ended*   *Nine months ended*     *September 30,*   September 30,   *September 30,*   September 30,       *2022*       2021       *2022*       2021    
*Net inflow (outflow) of cash related to the following activities:*                  
*Operating:*                  
Earnings (loss) from continuing operations after tax   *$* * 65.6*     $ (73.1 )   *$* * 137.4*     $ 35.6    
Adjustments to reconcile net earnings (loss) from continuing operations to net cash provided from operating activities:                  
Depreciation, depletion and amortization     *185.1*       173.2       *532.1*       530.3    
Share-based compensation expense     *1.4*       2.4       *7.4*       8.4    
Finance expense     *23.3*       18.5       *68.0*       56.0    
Deferred tax expense     *5.5*       8.2       *3.4*       4.5    
Foreign exchange (gains) losses and other     *(1.5* *)*     12.1       *8.2*       36.9    
Reclamation (recovery) expense     *(20.0* *)*     -       *3.9*       -    
Changes in operating assets and liabilities:                  
Accounts receivable and other assets     *(15.6* *)*     (11.3 ) -   *47.0*       (2.0 )  
Inventories     *(70.0* *)*     (11.6 )     *(222.4* *)*     (71.2 )  
Accounts payable and accrued liabilities     *12.9*       32.6       *64.0*       81.3    
*Cash flow provided from operating activities*     *186.7*       151.0       *649.0*       679.8    
Income taxes paid     *(13.5* *)*     (10.7 )     *(120.8* *)*     (132.7 )  
*Net cash flow of continuing operations provided from operating activities*     *173.2*       140.3       *528.2*       547.1    
*Net cash flow of discontinued operations (used in) provided from operating activities*     *(1.6* *)*     129.6       *47.6*       390.8    
*Investing:*                  
Additions to property, plant and equipment     *(197.3* *)*     (203.8 )     *(447.4* *)*     (566.0 )  
Interest paid capitalized to property, plant and equipment     *(20.5* *)*     (13.0 )     *(36.7* *)*     (43.2 )  
Acquisitions net of cash acquired     *-*       -       *(1,027.5* *)*     -    
Net additions to long-term investments and other assets     *(9.5* *)*     (12.4 )     *(43.6* *)*     (28.9 )  
(Increase) decrease in restricted cash - net     *(1.2* *)*     0.5       *(2.3* *)*     -    
Interest received and other - net     *2.0*       (2.4 )     *6.7*       (1.4 )  
*Net cash flow of continuing operations used in investing activities*     *(226.5* *)*     (231.1 )     *(1,550.8* *)*     (639.5 )  
*Net cash flow of discontinued operations provided from (used in) investing activities*     *43.3*       (27.9 )     *296.2*       (215.1 )  
*Financing:*                  
Proceeds from drawdown of debt     *100.0*       -       *1,197.6*       -    
Repayment of debt     *(200.0* *)*     -       *(320.0* *)*     (500.0 )  
Interest paid     *(26.2* *)*     (20.0 )     *(51.8* *)*     (46.9 )  
Payment of lease liabilities     *(6.0* *)*     (8.5 )     *(17.1* *)*     (24.1 )  
Dividends paid to common shareholders     *(39.0* *)*     (37.8 )     *(116.9* *)*     (113.5 )  
Repurchase and cancellation of shares     *(60.2* *)*     (31.8 )     *(60.2* *)*     (31.8 )  
Other - net     *(4.9* *)*     (1.0 )     *3.9*       7.9    
*Net cash flow of continuing operations (used in) provided from financing activities*     *(236.3* *)*     (99.1 )     *635.5*       (708.4 )  
*Net cash flow of discontinued operations used in financing activities*     *-*       -       *-*       -    
*Effect of exchange rate changes on cash and cash equivalents of continuing operations*     *(1.0* *)*     (0.5 )     *(1.4* *)*     (0.5 )  
*Effect of exchange rate changes on cash and cash equivalents of discontinued operations*     *(0.3* *)*     (0.8 )     *1.6*       0.8    
*Decrease in cash and cash equivalents*     *(249.2* *)*     (89.5 )     *(43.1* *)*     (624.8 )  
*Cash and cash equivalents, beginning of period*     *719.1*       675.6       *531.5*       1,210.9    
*Cash and cash equivalents of assets held for sale, beginning of period*     *18.5*       -       *-*       -    
*Cash and cash equivalents, end of period*   *$* * 488.4*     $ 586.1     *$* * 488.4*     $ 586.1      *Operating Summary* *Mine* *Period* *Tonnes Ore
Mined ^(d)* *Ore
Processed
(Milled)* *Ore
Processed
(Heap
Leach)* *Grade
(Mill) ^(d)* *Grade
(Heap
Leach)* *Recovery
*^*(a)(d)* *Gold Eq
Production
*^*(b)* *Gold Eq
Sales *^*(b)* *Production
cost of
sales* *Production
cost of
sales/oz *^*(c)* *Total Cap
Ex *^*(e)* *DD&A*     ('000 tonnes) ('000 tonnes) ('000 tonnes) (g/t) (g/t) (%) (ounces) (ounces) ($ millions) ($/ounce) ($ millions) ($ millions)
*Americas* *Fort Knox* *Q3 2022* *15,547* *2,477* *13,120* *0.71* *0.21* *80* *%* *75,522* *74,221* *$* * 88.6* *$* * 1,194* *$* * 31.0* *$* * 21.8*
Q2 2022 14,591 2,260 12,785 0.72 0.19 81 % 77,184 77,698 $ 92.6 $ 1,192 $ 13.1 $ 26.1
Q1 2022 13,743 1,852 13,010 0.66 0.17 80 % 54,803 52,813 $ 67.4 $ 1,276 $ 2.9 $ 20.9
Q4 2021 9,203 2,148 8,185 0.73 0.19 82 % 73,830 74,384 $ 74.1 $ 996 $ 31.6 $ 30.9
Q3 2021 8,024 2,221 6,395 0.77 0.20 82 % 71,336 71,482 $ 67.7 $ 947 $ 37.4 $ 29.7
*Round Mountain* *Q3 2022* *8,856* *1,021* *8,336* *0.64* *0.27* *79* *%* *62,417* *61,757* *$* * 87.0* *$* * 1,409* *$* * 24.7* *$* * 17.6*
Q2 2022 6,702 945 6,515 0.67 0.32 78 % 56,709 51,455 $ 74.8 $ 1,454 $ 20.6 $ 11.7
Q1 2022 3,767 929 3,208 0.80 0.36 79 % 45,319 46,959 $ 52.3 $ 1,114 $ 16.0 $ 12.1
Q4 2021 1,755 1,057 1,529 0.64 0.33 75 % 51,549 52,723 $ 51.8 $ 982 $ 50.3 $ 14.5
Q3 2021 1,531 915 4,442 0.63 0.29 76 % 63,242 61,405 $ 60.8 $ 990 $ 23.7 $ 16.3
*Bald Mountain* *Q3 2022* *4,152* *-* *4,152* *-* *0.37* *nm* *65,394* *52,472* *$* * 51.2* *$* * 976* *$* * 28.2* *$* * 39.1*
Q2 2022 4,945 - 4,945 - 0.60 nm 54,108 54,472 $ 54.5 $ 1,001 $ 16.2 $ 38.4
Q1 2022 3,870 - 3,870 - 0.63 nm 36,071 41,017 $ 40.3 $ 983 $ 5.8 $ 35.1
Q4 2021 5,222 - 5,222 - 0.52 nm 61,036 53,559 $ 50.1 $ 935 $ 17.2 $ 57.2
Q3 2021 5,941 - 5,941 - 0.46 nm 55,559 52,874 $ 48.8 $ 923 $ 7.7 $ 59.4
*Paracatu* *Q3 2022* *11,752* *13,797* *-* *0.45* *-* *79* *%* *159,113* *152,616* *$* * 131.1* *$* * 859* *$* * 33.6* *$* * 47.2*
Q2 2022 11,011 15,133 - 0.35 - 75 % 129,423 133,472 $ 129.6 $ 971 $ 31.2 $ 46.0
Q1 2022 6,165 13,645 - 0.33 - 75 % 108,009 101,886 $ 106.6 $ 1,046 $ 16.0 $ 39.6
Q4 2021 13,036 15,451 - 0.35 - 77 % 138,669 145,691 $ 116.9 $ 802 $ 49.6 $ 47.7
Q3 2021 14,107 15,085 - 0.37 - 76 % 134,425 133,924 $ 103.7 $ 774 $ 30.0 $ 44.5
*La Coipa* *Q3 2022* *1,079* *637* - *1.19* *-* *83* *%* *33,955* *24,681* *$* * 12.1* *$* * 490* *$* * 34.7* *$* * -*
Q2 2022 550 321 - 0.74 - 69 % 7,414 7,099 $ 5.6 $ 789 $ 39.0 $ -
Q1 2022 174 58 - nm - nm 524 - $ - $ - $ 35.8 $ -
Q4 2021 nm - - - - -   - - $ - $ - $ 43.2 $ -
Q3 2021 nm - - - - -   - - $ - $ - $ 28.1 $ -
*West Africa* *Tasiast* *Q3 2022* *4,437* *1,741* *-* *2.72* *-* *89* *%* *132,754* *128,014* *$* * 94.8* *$* * 741* *$* * 33.4* *$* * 58.0*
Q2 2022 3,053 1,680 - 2.51 - 89 % 129,140 114,064 $ 93.3 $ 818 $ 24.3 $ 56.4
Q1 2022 3,462 1,524 - 2.54 - 94 % 133,695 130,195 $ 95.8 $ 736 $ 19.4 $ 57.1
Q4 2021 1,061 1,068 - 1.50 - 94 % 15,253 15,006 $ 10.8 $ 720 $ 52.5 $ 13.1
Q3 2021 822 - - - - -   3,847 4,822 $ 8.3 $ 1,721 $ 68.1 $ 21.3

^(a)  Due to the nature of heap leach operations, recovery rates at Bald Mountain cannot be accurately measured on a quarterly basis. Recovery rates at Fort Knox, Round Mountain and Tasiast represent mill recovery only.
(b)  Gold equivalent ounces include silver ounces produced and sold converted to a gold equivalent based on the ratio of the average spot market prices for the commodities for each period. The ratios for the quarters presented are as follows: Q3 2022: 89.91:1; Q2 2022: 82.76:1; Q1 2022: 78.19:1; Q4 2021: 76.89:1; Q3 2021: 73.45:1.
(c) “Production cost of sales per equivalent ounce sold” is defined as production cost of sales divided by gold equivalent ounces sold.
(d)  "nm" means not meaningful.
(e)  "Capital expenditures" is as reported as “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows.

*
Reconciliation of non-GAAP financial measures and ratios*

The Company has included certain non-GAAP financial measures and ratios in this document. These measures and ratios are not defined under International Financial Reporting Standards (IFRS) and should not be considered in isolation. The Company believes that these financial measures and ratios, together with financial measures and ratios determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. The inclusion of these financial measures and ratios is meant to provide additional information and should not be used as a substitute for performance measures prepared in accordance with IFRS. These financial measures and ratios are not necessarily standard and therefore may not be comparable to other issuers.

All the non-GAAP financial measures and ratios in this document are from continuing operations and exclude results from the Company’s Chirano and Russian operations due to the classification of these operations as discontinued. The comparative information has been recast to exclude Chirano and Russia. As a result of the exclusion of Chirano, the following non-GAAP financial measures and ratios are no longer on an attributable basis, but on a total basis: production cost of sales from continuing operations per ounce sold on a by-product basis and all-in-sustaining cost from continuing operations per equivalent ounce sold and per ounce sold on a by-product basis.

*Adjusted net earnings from continuing operations attributable to common shareholders *and* adjusted net earnings from continuing operations per share *are non-GAAP financial measures and ratios which determine the performance of the Company, excluding certain impacts which the Company believes are not reflective of the Company’s underlying performance for the reporting period, such as the impact of foreign exchange gains and losses, reassessme

Full Article