Massive 25,000 ton girder installed to connect Mumbai Coastal Road with Sea Link

Massive 25,000 ton girder installed to connect Mumbai Coastal Road with Sea Link

Mid-Day

Published

The installation of the 136-metre-long bow-string-arch-type girder at Worli began at 2 am and was completed by 3.25 am, said BMC.

Full Article